The density road · pan by pan · one season

Twenty-three and a half degrees, walked one pan at a time

Brine does not move down this works by pump. It moves by weir: each pan sits a little lower than the one before it, and when the reading at the far wall reaches the figure in the table below, a board is lifted and the pan walks on. The whole road is 26 hectares of standing water and one sluice, and it runs on sun and wind alone.

The reason there are nine pans and not one is that seawater is not only salt. Every mineral in it has a density at which it gives up, and they do not give up together — carbonate at about 7, gypsum between 14 and 16, sodium chloride at 25.7. Each pan exists to take one of them out before the next pan is allowed to fall.

Two very large shallow evaporation pans seen from above, divided by a long earth bank with a weir box set into it.
Condensers 1 and 2, from 300 m printed at 7.0 °Bé

The pans, in order

Pan In at Out at Area Depth Falls out here
Reservoir 3.5 3.5 9,400 m² 1.8 m Nothing — it is the control
Condenser 1 3.5 5.2 34,000 m² 40 cm Silt, weed, the last of the estuary
Condenser 2 5.2 7.0 27,000 m² 28 cm Calcium carbonate
Pan 3 7.0 12.4 12,600 m² 25 cm Nothing — it is only water leaving
Pan 4 12.4 16.0 9,400 m² 25 cm Gypsum, in clear needles
Pan 5 16.0 25.7 7,800 m² 22 cm The last gypsum; the pan turns red
Crystallisers 6a—6f 25.7 27.0 4,200 m² 20 cm Sodium chloride — the salt
Bittern tank 27.0 29.5 12,000 L Magnesium and potassium salts

61,000 m² of condensers against 4,200 m² of crystallisers. That ratio is not a preference — it is what evaporation requires to put 39 tonnes of seawater through the works for every tonne of salt that leaves it.

The works, drawn to area

SEA RESERVOIR 3.5 °Bé — held CONDENSERS 1—2 3.5 → 7 PANS 3—4 7 → 16 PAN 5 16 → 25.7 CRYSTALLISERS 6a—6f 25.7 → 27 BITTERN 29.5 +

The plan is drawn to the pans' relative areas and scrolls sideways.

How the season runs

Stage Dates Note
Flooding late April reservoir first, then condensers 1 and 2
First walk-on late May condenser 2 to pan 3, at 7.0 °Bé
Crystallisers filled first week of July 6a and 6b, 20 cm, from pan 5 at 25.7
First rake second week of July nine to fourteen days after filling
Pan walks Thursdays, 14:00, May to September twelve people, £8, flat ground, no shade
Last rake September, weather deciding whenever rain puts a crystalliser back to 24
Sweep October floors scraped, banks re-puddled, works closed

Everything on this page is measured at 07:00 with a glass hydrometer, pan by pan, and written on a board in the sluice house before it is written anywhere else.

Next: the four grades and what each is for.